Skip to content

Same-day emergency service

A mini excavator digging a narrow trench across a backyard lawn beside a brick house, soil on a tarp

Drain excavation Brisbane

When the pipe has to come up, we dig with a plan.

Some drains can't be patched or lined from the inside. When digging is the right repair, we locate everything underground first, open up only what's needed, fix the pipe properly and leave the site tidy.

The short version

  1. 1Services located and marked before a shovel goes in
  2. 2Trained excavation operators, with machinery hired to suit your site
  3. 3What's included, and the price, explained before we start
95% booked within 4 hours

What's going on?

Tell us the problem and we'll call you back with next steps.

Type of problem

Protected by hCaptcha. Privacy and Terms apply.

Urgent? Call 07 3335 5607

When is excavation the right call?

Digging is a last resort. Sometimes it's the right one.

Where the pipework is suitable, relining can avoid most of the digging. These are the jobs where excavation usually gives the better result.

  • The pipe has collapsed

    A section that has caved in or lost its shape can't hold a liner. It has to be replaced.

  • A sag holds water

    When part of the line has sunk, waste settles in the dip. Re-laying it at the right fall is the fix.

  • The damage is too far gone

    Pipe that is badly broken along its length is often better replaced than repaired piece by piece.

  • New junctions or a reroute

    Moving a line, adding a connection or replacing a fitting means getting to the pipe.

  • Gullies and openings

    A broken gully riser or buried inspection opening is usually rebuilt from above.

  • The camera says so

    We only recommend digging after an inspection shows it's the sensible repair for your pipe.

What an excavation day looks like

Locate, dig, repair, test.

Every dig-up follows the same order, so nothing underground is a surprise and nothing gets covered before it's checked.

  1. Step 01

    Locate and mark everything

    We check Before You Dig Australia (BYDA) plans, trace the drain with a pipe locator and mark its path and depth. Other services, like water, power and gas, are located so we dig around them, not into them.

    Spray-painted lines and marker flags on a driveway and lawn tracing an underground pipe
  2. Step 02

    Cut and open up

    Concrete or paving is saw-cut in clean lines. Then we dig, by machine where it's safe and there's room, and by hand near other services or tight spots.

    A worker in ear muffs and safety glasses saw-cutting a straight line in a concrete driveway
  3. Step 03

    Repair the pipe

    The damaged length comes out and new pipe goes in, joined to the sound pipe either side and bedded at the right fall.

    Gloved hands tightening a coupling that joins new PVC pipe to old clay pipe in a trench
  4. Step 04

    Test before we backfill

    We check the repair with the camera and flow water through it while the trench is still open. Only then does it get covered.

    A plumber shining a torch on a new PVC-to-clay sewer pipe coupling in an open trench, with a drain camera set up at an inspection opening nearby

Our trained excavation operators run the machine. Excavators are hired to suit each site.

Told your drain needs digging up?

We're happy to take a look first. A camera inspection shows whether excavation is really the right repair, and how much needs to come up.

What happens to your yard and driveway

A trench for a while. No surprises after.

Digging does disturb things. Here's how we keep it contained, and how we make sure you know what to expect afterwards.

A neat trench along a lawn with soil heaped on tarps, turf rolled aside and boards laid as a walkway
  • Only as wide and as long as needed

    The locator tells us where to dig, so the trench stays small.

  • Soil kept off the lawn

    Spoil goes on tarps and turf is lifted and set aside where we can.

  • Clean cuts in hard surfaces

    Saw-cut concrete leaves straight edges that are easier to patch.

  • Backfilled and compacted

    The trench is filled in layers once the repair has been tested.

  • Reinstatement explained up front

    Before work starts, we'll tell you what making good is included in the price, and anything that isn't.

A mini excavator digging a trench in the rain, with pipe lying across the lawn

Who does the digging

Plumbers who can run the machine and fix the pipe.

Our team includes trained excavation operators, so the people digging understand the drain they're digging to. We hire the right size excavator for your site, from a compact machine for a narrow side path to something larger for a long run.

Concrete cutting is part of normal trade work for us. Where a job needs another trade, such as concreting, landscaping or waterproofing, we'll tell you upfront and help coordinate it.

  • Trained excavation operators in the team
  • Excavators hired to suit access and depth
  • Concrete cutting and demolition gear
  • Coordination with other trades where needed

What does drain excavation cost?

Every dig is different. Your price comes first.

  1. 01

    How deep the pipe is

    Deeper trenches take longer and may need shoring.

  2. 02

    How much needs replacing

    One broken joint is a smaller job than a whole run.

  3. 03

    What's on the surface

    Lawn is quicker to open than concrete, pavers or a deck.

  4. 04

    Site access

    Whether a machine fits, or parts must be dug by hand.

  5. 05

    Other services nearby

    Working carefully around water, power or gas lines takes time.

  6. 06

    Making good afterwards

    What reinstatement is included is set out before work starts.

Upfront pricing

Price agreed before the first cut. If we find a surprise underground, we stop and talk to you.

First-visit fix rate
9/10
jobs fixed first visit
Workmanship guarantee
12mths
workmanship guarantee

Drain excavation FAQ

Before you agree to a dig-up.

Can't see yours? Our friendly team is happy to help.

  • A camera inspection shows it. If the pipe has collapsed, sagged or broken up badly, excavation is usually the sound repair. If it has kept its shape, relining may be an option where the pipework is suitable.

  • It depends on how deep and long the trench is, the access, and what's on the surface. We'll give you a realistic timeframe with your quote.

  • We backfill and compact the trench once the repair is tested. What else is included, such as relaying turf or patching concrete, depends on the job, and we'll spell it out before work starts so there's no confusion later.

  • BYDA is the national referral service that provides plans of underground utility assets. We check it before excavating so we know where other services are likely to run, then confirm on site.

  • Often, yes, by saw-cutting the concrete and opening up only the section we need. Under a house slab, other approaches may make more sense. We'll talk you through what suits your situation.

  • Usually for part of the day while the old pipe is out and the new one goes in. We'll tell you when to avoid flushing or running water, and keep the time as short as we can.

A plumber sweeping a driveway beside a neat new strip of concrete next to the front lawn of a brick house

Need a drain dug up in Brisbane?

Dig once, dig in the right spot.

Share what the camera found, or what you've noticed, and we'll check the line, explain whether excavation is the right repair and give you the price before any work starts.

Call nowBook